Preliminary 2025 facility recordOperating
Taunton, MA · EIA plant 1682
Cleary Flood Hybrid
Cleary Flood Hybrid is a oil & gas power facility in Taunton, MA, with 121 MW of operating capacity.
Capacity profile
Fuel and technology
Operating
Oil & gas118 MW
Storage3 MW
ProposedNo proposed capacity reported
Reported technologiesBatteriesNatural Gas Fired Combined Cycle
Source quality
Preliminary facility data
This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.