Preliminary 2025 facility recordOperating

Pinconning, MI · EIA plant 56852

Pinconning White Feather

Pinconning White Feather is a biomass power facility in Pinconning, MI, with 3 MW of operating capacity.

Operating capacity3 MW2 operating generators
Proposed capacity0 MW0 proposed generators
UtilityEnergy Developments, Inc d/b/a EDLEIA-reported operator
Balancing authorityMISOMidcontinent Independent Transmission System Operator, Inc..

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Biomass3 MW
ProposedNo proposed capacity reported
Reported technologiesLandfill Gas

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source