Preliminary 2025 facility recordOperating

Arlington, OR · EIA plant 57333

Leaning Juniper Wind Power II

Leaning Juniper Wind Power II is a wind power facility in Arlington, OR, with 199 MW of operating capacity.

Operating capacity199 MW1 operating generators
Proposed capacity0 MW0 proposed generators
UtilityAvangrid Power LLCEIA-reported operator
Balancing authorityAVRNAvangrid Renewables LLC

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Wind199 MW
ProposedNo proposed capacity reported
Reported technologiesOnshore Wind Turbine

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source