Preliminary 2025 facility recordOperating

Livingston, TX · EIA plant 58645

RC Thomas Hydroelectric Project

RC Thomas Hydroelectric Project is a hydro power facility in Livingston, TX, with 27 MW of operating capacity.

Operating capacity27 MW3 operating generators
Proposed capacity0 MW0 proposed generators
UtilityEast Texas Electric Coop, IncEIA-reported operator
Balancing authorityMISOMidcontinent Independent Transmission System Operator, Inc..

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Hydro27 MW
ProposedNo proposed capacity reported
Reported technologiesConventional Hydroelectric

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source