Preliminary 2025 facility recordOperating

Cantil, CA · EIA plant 59317

Hecate Energy Beacon Solar 4

Hecate Energy Beacon Solar 4 is a solar power facility in Cantil, CA, with 50 MW of operating capacity.

Operating capacity50 MW1 operating generators
Proposed capacity0 MW0 proposed generators
UtilityAES Distributed EnergyEIA-reported operator
Balancing authorityLDWPLos Angeles Department of Water and Power

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Solar50 MW
ProposedNo proposed capacity reported
Reported technologiesSolar Photovoltaic

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.