Preliminary 2025 facility recordOperating

Village of Minster, OH · EIA plant 60299

HMV Minster Energy Storage System

HMV Minster Energy Storage System is a storage power facility in Village of Minster, OH, with 7 MW of operating capacity.

Operating capacity7 MW1 operating generators
Proposed capacity0 MW0 proposed generators
UtilitySummit Ridge EnergyEIA-reported operator
Balancing authorityPJMPJM Interconnection, LLC

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Storage7 MW
ProposedNo proposed capacity reported
Reported technologiesBatteries

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source