Preliminary 2025 facility recordOperating

McCamey, TX · EIA plant 60436

East Pecos Solar

East Pecos Solar is a solar power facility in McCamey, TX, with 119 MW of operating capacity.

Operating capacity119 MW1 operating generators
Proposed capacity0 MW0 proposed generators
UtilitySouthern Power CoEIA-reported operator
Balancing authorityERCOElectric Reliability Council of Texas, Inc.

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Solar119 MW
ProposedNo proposed capacity reported
Reported technologiesSolar Photovoltaic

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source