Preliminary 2025 facility recordOperating
Mendon, MA · EIA plant 61069
BWC Wading River One, Two, Three CSG
BWC Wading River One, Two, Three CSG is a solar power facility in Mendon, MA, with 3 MW of operating capacity.
Capacity profile
Fuel and technology
Operating
Solar3 MW
ProposedNo proposed capacity reported
Reported technologiesSolar Photovoltaic
Source quality
Preliminary facility data
This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.