Preliminary 2025 facility recordOperating

Wayside, VA · EIA plant 62675

Skipjack Solar Center

Skipjack Solar Center is a solar power facility in Wayside, VA, with 175 MW of operating capacity.

Operating capacity175 MW1 operating generators
Proposed capacity0 MW0 proposed generators
UtilityAES Distributed EnergyEIA-reported operator
Balancing authorityPJMPJM Interconnection, LLC

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Solar175 MW
ProposedNo proposed capacity reported
Reported technologiesSolar Photovoltaic

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source