Preliminary 2025 facility recordOperating
Fayetteville, AR · EIA plant 62682
Noland Wastewater Treatment Plant Hybrid
Noland Wastewater Treatment Plant Hybrid is a storage power facility in Fayetteville, AR, with 11 MW of operating capacity.
Capacity profile
Fuel and technology
Operating
Storage6 MW
Solar5 MW
ProposedNo proposed capacity reported
Reported technologiesBatteriesSolar Photovoltaic
Source quality
Preliminary facility data
This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.