Preliminary 2025 facility recordOperating
Agawam, MA · EIA plant 63763
CES Agawam Tuckahoe Solar Hybrid
CES Agawam Tuckahoe Solar Hybrid is a solar power facility in Agawam, MA, with 6 MW of operating capacity.
Capacity profile
Fuel and technology
Operating
Solar4 MW
Storage3 MW
ProposedNo proposed capacity reported
Reported technologiesBatteriesSolar Photovoltaic
Source quality
Preliminary facility data
This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.