Preliminary 2025 facility recordOperating

Lennon, MI · EIA plant 64196

Assembly Solar III

Assembly Solar III is a solar power facility in Lennon, MI, with 79 MW of operating capacity.

Operating capacity79 MW1 operating generators
Proposed capacity0 MW0 proposed generators
UtilityAssembly Solar III, LLCEIA-reported operator
Balancing authorityMISOMidcontinent Independent Transmission System Operator, Inc..

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Solar79 MW
ProposedNo proposed capacity reported
Reported technologiesSolar Photovoltaic

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source