Preliminary 2025 facility recordOperating

Baltimore, MD · EIA plant 66539

CPG - Duke 6000 Holabird

CPG - Duke 6000 Holabird is a solar power facility in Baltimore, MD, with 2 MW of operating capacity.

Operating capacity2 MW1 operating generators
Proposed capacity0 MW0 proposed generators
UtilitySolar DG MD Holabird AJCFB, LLCEIA-reported operator
Balancing authorityPJMPJM Interconnection, LLC

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Solar2 MW
ProposedNo proposed capacity reported
Reported technologiesSolar Photovoltaic

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source