Preliminary 2025 facility recordOperating
Adelanto, CA · EIA plant 66885
Baldy Mesa 2_Silver Peak Hybrid
Baldy Mesa 2_Silver Peak Hybrid is a solar power facility in Adelanto, CA, with 75 MW of operating capacity.
Capacity profile
Fuel and technology
Operating
Solar50 MW
Storage25 MW
ProposedNo proposed capacity reported
Reported technologiesBatteriesSolar Photovoltaic
Source quality
Preliminary facility data
This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.