Preliminary 2025 facility recordProposed

Robert Lee, TX · EIA plant 68668

Coke BESS

Coke BESS is a storage power facility in Robert Lee, TX, with 220 MW of proposed capacity.

Operating capacity0 MW0 operating generators
Proposed capacity220 MW1 proposed generators
UtilityRIC Development, LLCEIA-reported operator
Balancing authorityERCOElectric Reliability Council of Texas, Inc.

Capacity profile

Fuel and technology

Nameplate capacity
OperatingNo operating capacity reported
Proposed
Storage220 MW
Reported technologiesBatteries

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source