Preliminary 2025 facility recordProposed

Mulberry, FL · EIA plant 69522

Brewster Solar

Brewster Solar is a solar power facility in Mulberry, FL, with 43 MW of proposed capacity.

Operating capacity0 MW0 operating generators
Proposed capacity43 MW1 proposed generators
UtilityTampa Electric CoEIA-reported operator
Balancing authorityTECTampa Electric Company

Capacity profile

Fuel and technology

Nameplate capacity
OperatingNo operating capacity reported
Proposed
Solar43 MW
Reported technologiesSolar Photovoltaic

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source