Preliminary 2025 facility recordProposed

Mojave, CA · EIA plant 69956

Sanborn Hybrid 3

Sanborn Hybrid 3 is a solar power facility in Mojave, CA, with 578 MW of proposed capacity.

Operating capacity0 MW0 operating generators
Proposed capacity578 MW4 proposed generators
UtilityTerra-Gen Operating Co-HybridEIA-reported operator
Balancing authorityCISOCalifornia Independent System Operator

Capacity profile

Fuel and technology

Nameplate capacity
OperatingNo operating capacity reported
Proposed
Solar368 MW
Storage210 MW
Reported technologiesBatteriesSolar Photovoltaic

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source