Preliminary 2025 facility recordOperating

Concrete, WA · EIA plant 3861

Upper Baker

Upper Baker is a hydro power facility in Concrete, WA, with 105 MW of operating capacity.

Operating capacity105 MW2 operating generators
Proposed capacity0 MW0 proposed generators
UtilityPuget Sound Energy IncEIA-reported operator
Balancing authorityPSEIPuget Sound Energy

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Hydro105 MW
ProposedNo proposed capacity reported
Reported technologiesConventional Hydroelectric

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source