Preliminary 2025 facility recordOperating
Casa Grande, AZ · EIA plant 61678
Pinal Central Energy Center Hybrid
Pinal Central Energy Center Hybrid is a solar power facility in Casa Grande, AZ, with 30 MW of operating capacity.
Capacity profile
Fuel and technology
Operating
Solar20 MW
Storage10 MW
ProposedNo proposed capacity reported
Reported technologiesBatteriesSolar Photovoltaic
Source quality
Preliminary facility data
This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.