Preliminary 2025 facility recordOperating

Fallon, NV · EIA plant 61809

Stillwater Solar PV II

Stillwater Solar PV II is a solar power facility in Fallon, NV, with 20 MW of operating capacity.

Operating capacity20 MW1 operating generators
Proposed capacity0 MW0 proposed generators
UtilityOrmat Stillwater Solar PV II, LLCEIA-reported operator
Balancing authorityNEVPNevada Power Company

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Solar20 MW
ProposedNo proposed capacity reported
Reported technologiesSolar Photovoltaic

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source