Preliminary 2025 facility recordOperating

Moapa, NV · EIA plant 62248

Arrow Canyon Solar Hybrid

Arrow Canyon Solar Hybrid is a solar power facility in Moapa, NV, with 275 MW of operating capacity.

Operating capacity275 MW2 operating generators
Proposed capacity0 MW0 proposed generators
UtilityArrow Canyon Solar LLCEIA-reported operator
Balancing authorityNEVPNevada Power Company

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Solar200 MW
Storage75 MW
ProposedNo proposed capacity reported
Reported technologiesBatteriesSolar Photovoltaic

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source