Preliminary 2025 facility recordProposed

Irvine, KY · EIA plant 62390

KY No. 11 L&D Hydroelectric Project

KY No. 11 L&D Hydroelectric Project is a hydro power facility in Irvine, KY, with 3 MW of proposed capacity.

Operating capacity0 MW0 operating generators
Proposed capacity3 MW6 proposed generators
UtilityLock 11 Hydro Partners, LLCEIA-reported operator
Balancing authorityPJMPJM Interconnection, LLC

Capacity profile

Fuel and technology

Nameplate capacity
OperatingNo operating capacity reported
Proposed
Hydro3 MW
Reported technologiesConventional Hydroelectric

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source