Preliminary 2025 facility recordOperating
Pueblo Pintado, NM · EIA plant 63172
Arroyo Solar Energy Storage Hybrid
Arroyo Solar Energy Storage Hybrid is a solar power facility in Pueblo Pintado, NM, with 450 MW of operating capacity.
Capacity profile
Fuel and technology
Operating
Solar300 MW
Storage150 MW
ProposedNo proposed capacity reported
Reported technologiesBatteriesSolar Photovoltaic
Source quality
Preliminary facility data
This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.