Preliminary 2025 facility recordOperating
Granite Falls, NC · EIA plant 64910
Brighter Future Solar
Brighter Future Solar is a solar power facility in Granite Falls, NC, with 11 MW of operating capacity.
Capacity profile
Fuel and technology
Operating
Solar11 MW
ProposedNo proposed capacity reported
Reported technologiesSolar Photovoltaic
Source quality
Preliminary facility data
This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.