Preliminary 2025 facility recordOperating

Cambridge, ID · EIA plant 811

Brownlee

Brownlee is a hydro power facility in Cambridge, ID, with 675 MW of operating capacity.

Operating capacity675 MW5 operating generators
Proposed capacity0 MW0 proposed generators
UtilityIdaho Power CoEIA-reported operator
Balancing authorityIPCOIdaho Power Company

Capacity profile

Fuel and technology

Nameplate capacity
Operating
Hydro675 MW
ProposedNo proposed capacity reported
Reported technologiesConventional Hydroelectric

Source quality

Preliminary facility data

This page uses the EIA-860 2025 Early Release. EIA identifies the release as preliminary, so it should not be used for official state or national aggregation. Capacity is nameplate capacity, not real-time output or annual generation.

Read methodologyEIA-860 source